01-15-2008, 08:50 AM | #1 |
Rock Crawler Join Date: Nov 2007 Location: Dayton, Ohio
Posts: 506
| Edge
I Just bought one and was wondering how long it took for you guys to get your? I have the stage 2 done with 70mm upper links on my ax-10 right now, am I going to be able to run then on the edge or will I have to go back to to the 55mm uppers? Thanks Justin |
Sponsored Links | |
01-15-2008, 09:22 AM | #2 |
Pebble Pounder Join Date: Mar 2007 Location: Vancouver,BC,Canada
Posts: 183
|
Justin, I ordered my " EDGE" on Dec 31 in the afternoon,it was shipped on Jan 2 and I had it on Jan 4.TCS has the fastest shipping.As far as the link lengths go I am using the standard ones. Enjoy |
01-15-2008, 09:56 AM | #3 |
Quarry Creeper Join Date: Sep 2007 Location: Kelowna BC Canada
Posts: 297
|
I got mine in 7 days up to canada which is really fast from the states. Im also running the stock upper links and they seem to work fine.
|
01-15-2008, 10:07 AM | #4 |
RCC Addict Join Date: Oct 2007 Location: Commerce Twp.
Posts: 1,773
|
You will have to use the 55mm links. The stock edge chassis does not have the standoffs for the 70mm links. Some guys have brazed or welded them on the edge chassis.
|
01-15-2008, 11:01 AM | #5 |
Quarry Creeper Join Date: Jun 2007 Location: bay area
Posts: 223
|
i had mine in two days |
01-15-2008, 11:07 AM | #6 |
Rock Stacker Join Date: Oct 2007 Location: Devon, UK
Posts: 79
| I took mine to 61mm using the 6mm spacer and moved to the inside mounting holes. This lifts the pinion angle up also.
Last edited by motormad; 01-15-2008 at 01:54 PM. |
| |