Re: Soze's GMADE GS02 BOM Build Kool...sub'd. Enjoy the build. |
Re: Soze's GMADE GS02 BOM Build Steps 1-13: Axles Let's begin https://farm2.staticflickr.com/1862/...2e2407e2_b.jpg Parts needed for this step https://farm2.staticflickr.com/1842/...3b0bdd3d_b.jpg https://farm2.staticflickr.com/1847/...481385f8_b.jpg Metal balls given to the first batch of BOMs https://farm2.staticflickr.com/1899/...68e4050b_b.jpg The well labeled hardware bags. Wish they would've went a step further and grouped the hardware by steps as well. https://farm2.staticflickr.com/1891/...bb80fca7_b.jpg https://farm2.staticflickr.com/1849/...9c9ee625_b.jpg Ready to begin https://farm2.staticflickr.com/1861/...06c248b3_b.jpg Diff gears finished https://farm2.staticflickr.com/1890/...a0388615_b.jpg Pinion Gear side of the axle https://farm2.staticflickr.com/1900/...05805fdf_b.jpg https://farm2.staticflickr.com/1886/...0a3024c2_b.jpg https://farm2.staticflickr.com/1890/...68844a9b_b.jpg The other side of the axle https://farm2.staticflickr.com/1869/...13708f1d_b.jpg All greased up https://farm2.staticflickr.com/1881/...6d6cfc0e_b.jpg C-Hubs going on https://farm2.staticflickr.com/1868/...5da09715_b.jpg https://farm2.staticflickr.com/1877/...e3ebf3d3_b.jpg Front CVDs https://farm2.staticflickr.com/1876/...24d67c9f_b.jpg https://farm2.staticflickr.com/1851/...5916bfeb_b.jpg Knuckles https://farm2.staticflickr.com/1858/...62e7836a_b.jpg https://farm2.staticflickr.com/1859/...74f2b0ce_b.jpg Link mounts https://farm2.staticflickr.com/1862/...f8284111_b.jpg https://farm2.staticflickr.com/1890/...6bb2411c_b.jpg Time for the rear axle https://farm2.staticflickr.com/1880/...94d79aeb_b.jpg https://farm2.staticflickr.com/1848/...c8f7fc4f_b.jpg https://farm2.staticflickr.com/1881/...eb290590_b.jpg https://farm2.staticflickr.com/1881/...1975da68_b.jpg https://farm2.staticflickr.com/1893/...827dc8bd_b.jpg https://farm2.staticflickr.com/1866/...874a33cd_b.jpg https://farm2.staticflickr.com/1888/...ae5f496c_b.jpg https://farm2.staticflickr.com/1852/...e6890e94_b.jpg Front and rear axles all done https://farm2.staticflickr.com/1886/...0c830ff1_b.jpg |
Re: Soze's GMADE GS02 BOM Build Welcome to the BOM club! You have much more patience for pics than I do. :) How are your axles? Any crunch going on there? Just curious. |
Re: Soze's GMADE GS02 BOM Build Quote:
Due to the crunch only happening in one section of a rotation, I'm inclined to think it's the assembling of the diff gear. Either I didn't put together that assembly evenly (which I did double-check), or the plastic housing on the diff assembly is molded unevenly. I wonder if the upgraded diff locker would help with the crunch. |
Re: Soze's GMADE GS02 BOM Build I know some of the parts are compatible with Axial SCX10 II parts and the gears look similar to the OG SCX10 so...do Axial gears drop into these axles? That might narrow down the crunching. |
Re: Soze's GMADE GS02 BOM Build Quote:
|
Re: Soze's GMADE GS02 BOM Build Steps 14-19 + 25: Transmission We start with the B-bag. https://farm2.staticflickr.com/1863/...55713098_b.jpg Step 14 parts https://farm2.staticflickr.com/1896/...d7ba95af_b.jpg Assembled gears https://farm2.staticflickr.com/1844/...b0df5e90_b.jpg Parts for the next steps https://farm2.staticflickr.com/1881/...c9cf113f_b.jpg Assembled and greased up https://farm2.staticflickr.com/1882/...32d53865_b.jpg Spur gear goes on. They use stacked conical washers instead of a spring for the slipper. Directions say to fully tighten the lock nut, and then loosen by about a quarter turn. Here's how it looks. https://farm2.staticflickr.com/1864/...4d63b4c3_b.jpg https://farm2.staticflickr.com/1899/...15f9390b_b.jpg Parts for the next step.. More e-clips yay... https://farm2.staticflickr.com/1893/...5f06d229_b.jpg Assembled gears... https://farm2.staticflickr.com/1897/...28a283f4_b.jpg Skipping to step 25 like new2rocks did. https://farm2.staticflickr.com/1874/...c93cc4b8_b.jpg Greased up. I wonder how the 2-speed option setup would look in this spot. That empty space has to be for something. https://farm2.staticflickr.com/1875/...9eb30578_b.jpg Transmission complete. https://farm2.staticflickr.com/1884/...2035a753_b.jpg https://farm2.staticflickr.com/1887/...a3ed38c7_b.jpg |
Re: Soze's GMADE GS02 BOM Build Quote:
|
Re: Soze's GMADE GS02 BOM Build Quote:
|
Re: Soze's GMADE GS02 BOM Build Quote:
I have a link the perfect size for mounting between the front shock towers for stability, but I hate to restrict my battery capacity that much.... |
Re: Soze's GMADE GS02 BOM Build Quote:
|
Re: Soze's GMADE GS02 BOM Build Quote:
|
Re: Soze's GMADE GS02 BOM Build Steps 20-23: Links This is going to be a pretty short step/post. Bag of parts for these steps https://farm2.staticflickr.com/1853/...75da462b_b.jpg Starting the front lower links https://farm2.staticflickr.com/1867/...f03f8f79_b.jpg https://farm2.staticflickr.com/1899/...125f314b_b.jpg Front upper link https://farm2.staticflickr.com/1882/...10484550_b.jpg https://farm2.staticflickr.com/1862/...76e77c84_b.jpg Rear lower links https://farm2.staticflickr.com/1844/...d2fde57e_b.jpg https://farm2.staticflickr.com/1894/...87667824_b.jpg Rear upper links https://farm2.staticflickr.com/1874/...9b88c817_b.jpg https://farm2.staticflickr.com/1842/...ffaefb3e_b.jpg |
Re: Soze's GMADE GS02 BOM Build Steps 24 + 26-29: Chassis Time to move onto the chassis. For this step, I also used the following non-kit items... Turnigy MG959 V2 Servo (available on eBay) Yeah Racing Hackmoto 550 35T Brushed Motor (available on eBay) Yeah Racing Aluminum 540 Motor Spacer Heatsink (available on eBay) Boom Racing 25T Alloy Servo Horn These are the parts needed for the battery tray https://farm2.staticflickr.com/1881/...267e6158_b.jpg I'll be using the Turnigy MG959 V2 Servo and a Boom Racing 25T Servo Horn https://farm2.staticflickr.com/1842/...12e4cc3b_b.jpg https://farm2.staticflickr.com/1887/...b4e4e99f_b.jpg https://farm2.staticflickr.com/1872/...0e3b2423_b.jpg Servo mounted onto the battery tray/servo mount assembly https://farm2.staticflickr.com/1869/...64f353e9_b.jpg https://farm2.staticflickr.com/1885/...c4f2c785_b.jpg These are the parts needed to start putting the frame rails together https://farm2.staticflickr.com/1864/...6e797d5b_b.jpg It's starting to look like a chassis! https://farm2.staticflickr.com/1886/...976d9f4b_b.jpg That under-frame receiver box that everybody has been putting weights in... I might do the same. https://farm2.staticflickr.com/1885/...dee69106_b.jpg https://farm2.staticflickr.com/1869/...d8d52677_b.jpg Time to get those links on https://farm2.staticflickr.com/1857/...c8c9956d_b.jpg Links mounted https://farm2.staticflickr.com/1860/...ed814bce_b.jpg Parts for mounting the motor https://farm2.staticflickr.com/1870/...08b91bcf_b.jpg I'll be using a Yeah Racing Hackmoto 550 35T Brushed Motor https://farm2.staticflickr.com/1861/...c08870e3_b.jpg So... I ran into a snag with this motor. The motor shaft is longer than normal, and I couldn't put the transmission cover on without hitting the motor shaft. So I had to get Yeah Racing Aluminum 540 Motor Spacer Heatsink https://farm2.staticflickr.com/1909/...ebd1e492_b.jpg With the spacer installed, I was now able to have the motor shaft clear. https://farm2.staticflickr.com/1934/...fcf98b32_b.jpg https://farm2.staticflickr.com/1903/...1898d533_b.jpg https://farm2.staticflickr.com/1924/...7eaa2720_b.jpg One thing I am concerned about is the pinion/spur mesh. It's tighter than I would like, and since the motor mount uses pre-set mounting holes, there's really no fine adjustment available. I will revisit this area later after I complete my build to see if there is a way I can make the pinion/spur mesh more to my liking. |
Re: Soze's GMADE GS02 BOM Build Nice write up, especially for the parts you are using in your build. I am interested in how you like the Hackmoto 35T. Keep the good work going "thumbsup" |
Re: Soze's GMADE GS02 BOM Build Cruising right along there, soze! Strangely, my pinion/spur mesh was almost exactly where I would've put it had there been more adjustment possible. It does seem sort of a strange arrangement as it doesn't take manufacturing tolerances of gears/spurs into account or allow for variance compensation. Not a big fan. Great pics & write-up. "thumbsup" |
Re: Soze's GMADE GS02 BOM Build I like that the battery tray is really low, but there seems to be a lot of extra stuff on the bottom of this truck to get snagged out in the woods. It'll be interesting to see how that plays out. |
Re: Soze's GMADE GS02 BOM Build Dude...GMADE GS02 BOM Build Series - Part 5 - Shocks...1:19...I heard "Team Associated penis slime", and now that's all I can hear. :lmao::lmao: |
Re: Soze's GMADE GS02 BOM Build Quote:
|
All times are GMT -6. The time now is 09:30 PM. |
Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.
Content Relevant URLs by vBSEO ©2011, Crawlability, Inc.
Copyright 2004-2014 RCCrawler.com