Rockpiledriver | 02-05-2007 02:12 PM | Quote:
Originally Posted by pro beater
WHEN and how much? | Once we have the testing done, 1-2 weeks max, they will go into production at that point it will be however long it takes MIP to run them. Price will be very close to what is available now for the clod, perhaps slightly higher because there is 2 hexes included allowing for stock width or 1/2" wider than stock overall. The other reason that they may be slightly higher is, these CVD's are designed specifically for the TLT knuckle/axle. The standard 1/18th cvd was too small, and the standard 1/8th scale (clodbuster) CVD was too big. We had these engineered and designed for this application, so that added some increased cost compared to other CVD's. |