So Ive decided that I am going to start turning one of my flowerbeds into a course, and would like tips, and ideas on what to add and do. Im planing on enlarging the flower bed to 6ftx26ft, grading the soil beneath it for drainage and adding a weed barrier, then filling in 2-3in of gravel as a base. Is that a good idea or do I need to add a deeper base of gravel. Also what size gravel should I use for the base? I plan on mostly using a Scale crawler/trail truck for the time being (TRX-4)
Last edited: