tjscrogins99
Pebble Pounder
I've been building a WK crawler and did not want to wait for the tlt link mounts to come back in stock so I just made upper link mounts out of 1/4 inch aluminum square tube($2 worth could make 10 sets of link mounts).
Just cut it to length I think mine were 3/4 of an inch,
drill holes to mount it to the axle(the middle two holes that the old 3 link mount used) and
drill holes going the other way through the tube to attach your upper links to.
I made made more than one set of mounting holes (the holes going parrallel with the axle) so I could easily change my drive line angle and wheelbase if needed. Ive got pictures on my comp but cannot figure out how to post them. I can email them if anyone is interested.
Just cut it to length I think mine were 3/4 of an inch,
drill holes to mount it to the axle(the middle two holes that the old 3 link mount used) and
drill holes going the other way through the tube to attach your upper links to.
I made made more than one set of mounting holes (the holes going parrallel with the axle) so I could easily change my drive line angle and wheelbase if needed. Ive got pictures on my comp but cannot figure out how to post them. I can email them if anyone is interested.