| |||||||
![]() |
| | LinkBack | Thread Tools | Display Modes |
| | #1 |
| Newbie Join Date: Dec 2006 Location: columbia
Posts: 34
| Im building a clod tuber with an EVX esc ans was wondering if Integy lathe 55t's would be best....i will be running the 6.75" clod swamp dawgs |
| | |
| Sponsored Links | |
| | #2 |
| Rock Crawler Join Date: Aug 2006 Location: On the trail
Posts: 671
| |
| | |
| | #3 |
| RCC Addict Join Date: Dec 2004 Location: Central NY
Posts: 1,988
| Depends on what you want. If you want a little more speed then 55t is good. If you want more power than anything, 67t or 75t would be best. |
| | |
| | #4 |
| Newbie Join Date: Nov 2005 Location: Vancouver
Posts: 34
| Check out the Axioms. Tammies hobbies in the vendor section has them. |
| | |
| | #5 |
| Newbie Join Date: Dec 2006 Location: columbia
Posts: 34
| well too late I guess i ordered 2 integy 55t's but i almost went with the 75t, i can always change up later |
| | |
![]() |
| Thread Tools | |
| Display Modes | |
| |